Place of Origin: | Jiangsu, China |
---|---|
Brand Name: | PIONEERTEX |
Certification: | ISO9001 & ISO14001 |
Model Number: | CMC5,CMC8,CMC13 |
Minimum Order Quantity: | 1000 Square Meter/Square |
Price: | $14.00 - $18.00 / Square Meter |
Packaging Details: | One layer of waterproof PE film inside, and one lay of PE Film outside. |
Supply Ability: | 2000 Square Meter/Square Meters per Week |
Warranty: | 5 Years | After-sale Service: | Online Technical Support |
---|---|---|---|
Project Solution Capability: | Graphic Design | Product Name: | Geosyntheic Cementious Composite Mat GCCM |
Color: | Green | Powder Material: | Concrete Powder |
Geotextile: | Polyester Geocomposite | Backing: | PE Film Or Aluminum Foil Composite |
Brand: | PIONEERTEX | Key Word: | CONCRETE MAT CLOTH |
Certificate: | SGS | Thickness: | 8MM |
TENSILE STRENGTH: | 50kn/m | Port: | NANJING Or Lianyungang Port |
Highlight: | 50kn/m Cement Sand Blanket Rolls,GCCM Concrete Erosion Mat,Slope Protection Concrete Erosion Mat |
Sand-Cement Mixture Blanket GCCM Rolls is PioneerTEX's another GCCM product.
Sand-Cement Mixture Blanket GCCM Rolls is close to Tilex rolls.
PioneerTEX could add 3D spacer fabric in the middle to improve its strength and property.
SCB(Sand-Cement Blanket) GCCM ADVANTAGE:
Rapid Install
CMC can be laid at a rate of 150m2/hours ,up to 10 times faster than conventional concrete solutions.
Easy to Use
CMC is available in man portable rolls for application with limited access such as 10mts long. It's also very easy to cut by "box cutter". The conncrete inside of CMC is pre-mixed so there is no need for mixing or compacting.
Lower Project Cost
The speed and ease of installation mean CMC GCCM is more cost-effective than conventional concrete,with less logistical complexity.
Eco-friendily
CMC is a low mass, low carbon technology which uses up to 95% less material than conventional concrete for many applications.
Long Expectation Life
CMC is made of high strength geotextile and special cement mixture. Its expectation life can reach more than 30 years. What's more, it is of no need for maintenance.
Specification
Sand-Cement Blanket(SCB) GCCM Physcial Properties | |||||
SCB | Thickness (mm) |
Mass(unset) (kg/m2) |
Density(unset) (kg/m3) |
Density(set) (Kg/m3) |
Roll Width (m) |
SCB5 | 5 | 8 | 1500 | 20% | 2.1 |
SCB8 | 8 | 11 | 1500 | 20% | 2.1 |
SCB13 | 13 | 18 | 1500 | 20% | 2.1 |
. | |||||
Pre-set CC Properties | |||||
Setting | |||||
Working time: 1-2 hours subject to ambient temperature. | |||||
SCB will achieve 70-80% strength at 24 hours after hydration. | |||||
Method of hydration | |||||
Spray the fiber surface with water until it it feels wet to touch for several minutes | |||||
after spraying. | |||||
Re-spray the SCB GCCM again after 1 hour if: | |||||
1. installing SCB in a steep or vertical surface; | |||||
2. Installing in warm climates; | |||||
Notes: | |||||
1. SCB can not be over hydrated and an excess of water is always recommended; | |||||
2. Minimum ratio of water:SCB by weight: 1:4 | |||||
3. Don't jet high pressure water directly onto the SCB as this may wash a channel in SCB . |
|||||
4 . Please use non-saline water for hydration.If SCB will be used for sea projects,please | |||||
advise us beforehand. | |||||
5. SCB can hydrate and set under water; | |||||
6. SCB has a working time of 1-6hours after hydration. Don't move or touch Cement Sand blanket | |||||
once it has begun to set. | |||||
7. Working time will be reduced in hot climate; | |||||
8. SCB will set hard in 2-3 hours,but will continue to gain strength for several months. | |||||
Set SCB Properties | |||||
Strength: PioneerTex Concrete Mat Cloth has very high early strength | |||||
Item | Test Method | MARV | |||
Compressive Strength | ASTMC109-02 | 35-40 Mpa | |||
Bending Strength | BS EN12467:2004 | 3-6 Mpa | |||
CBR Puncture Strength | EN ISO12236:2007 | 3.5KN | |||
Tensile Strength(KN/M) | |||||
Length Direction | Width Diection | ||||
SCB5 | 25 | 20 | |||
SCB8 | 28 | 24 | |||
SCB13 | 32 | 28 | |||
Other | |||||
Item | Test Method | Value | |||
Freeze-thaw resistance | BS EN12467:2004 Part5.5.2 | pass | |||
Soak Dry | BS EN12467:2004 Part5.5.5 | pass | |||
Water Impermeability | BS EN12467:2004 Part5.4.4 | pass | |||
Fire Retardant | 16 CFR PART 1633 | pass |
Who are we?
PioneerTEX is the professional and leading manufacturer of Concrete Mat Cloth rolls in China.
We have the patent for Concrete Mat Cloth in China.
We developed Concrete Mat Cloth Since 2014, and we get the patent in 2017.
And the technolog for Concrete Mat Cloth is mature in 2016.
What is Concrete Mat Cloth (CMC) GCCM ?
CMC GCCM is a flexible and soft cement impregnated fabric, that hardens on hydration to form a thin,durable,water proof and fire retardant concrete layer. Essentially, it's concrete on a roll.
What's the structure of Concrete Mat Cloth GCCM?
CMC GCCM was made of woven geotextile, nonwoven geotextile, HDPE geomembrane, and 3D structure geocomposite fabric.
The specially formulated dry concrete powder mix will be reinforced by 3D mesh geo-fabric, and sandwiched between porous nonwoven geotextile and water proof HDPE geomembrane or Aluminium Foil composite.
How does the Cement-Sand Blanket(CSB) GCCM work?
CMC GCCM allows concrete construction without the need for plant or mixing equipment. It's very easy, and just add water on the CMC non-waterproof side.
Once Set, the 3D mesh fabric will reinforce the concrete, prevent crack propagation and provide a safe plastic failure mode. The woven and nonwoven geotextile on the top side will offer special protection on the CMC, and offer higher tensile strength for composite.
HDPE geomembrane backing on the bottom surface of CMC ensures the material is completely water proof.
How many types of Cement-Sand Blanket(CSB) GCCM are we manufacturing?
CSB GCCM is available in 3 thickness:
CSB5,
CSB8
CSB13.
They are 5,8 and 13mm thick respectively.
The CSB will become hard after hydration as below:
The Concrete Mat Cloth rolls before hydration is as below:
Application:
Ditch line
Slope Protection
Tunnel lining
Pond liner
Water reservior