Place of Origin: | Jiangsu, China |
---|---|
Brand Name: | PIONEERTEX |
Certification: | ISO9001 & ISO14001 |
Model Number: | CMC5,CMC8,CMC13 |
Minimum Order Quantity: | 1000 Square Meter/Square |
Price: | $14.00 - $18.00 / Square Meter |
Packaging Details: | One layer of waterproof PE film inside, and one lay of PE Film outside. |
Supply Ability: | 2000 Square Meter/Square Meters per Week |
Warranty: | 5 Years | After-sale Service: | Online Technical Support |
---|---|---|---|
Project Solution Capability: | Graphic Design | Product Name: | Geosyntheic Cementious Composite Mat GCCM |
Color: | Green | Powder Material: | Concrete Powder |
Geotextile: | Polyester Geocomposite | Backing: | PE Film Or Aluminum Foil Composite |
Brand: | PIONEERTEX | Key Word: | CONCRETE MAT CLOTH |
Certificate: | SGS | Thickness: | 8MM |
TENSILE STRENGTH: | 50kn/m | Port: | NANJING Or Lianyungang Port |
Highlight: | 8mm concrete mat cloth,concrete mat cloth 8mm,cmc8 concrete mat cloth |
Concrete mat cloth GCCM-8mm permanent erosion control for slope protection
Concrete Mat cloth Geosynthetic Cementitious Composite Mat (GCCM) are a groundbreaking material technology that makes it possible to use concrete on slopes, in water, and in other hard-to-reach locations, without forms or mixing and minimal equipment requirements. An engineered concrete in roll form, Concrete Mat Cloth GCCM is fabricated with a three-dimensional structure that reinforces the concrete, providing strength and durability. Concrete Mat Cloth GCCM can be quickly cut and secured in place, making it ideal for reinforcing or rehabilitating a culvert or drainage ditch, abutment, beam or other structure. Once hydrated, the cloth cures quickly to form rigid, durable and water-resistant 5,000 psi armor. The cloth remains flexible for up to two hours and is easily manipulated to fit the contours of irregular installations.
Unlike regular concrete, Concrete Mat Cloth materials can be installed in the rain and other wet conditions, virtually eliminating rescheduling due to weather conditions.
The material is available in a three thicknesses: CMC5- 5 mm, CMC8- 8 mm, and CMC13- 13 mm, and in two formats (roll sizes): bulk rolls or small man-potable batch rolls. The quantity per roll differs between the thicknesses, which can be found on the data sheet. All three thicknesses are available in bulk rolls.
Specification
Concrete Mat Cloth GCCM Physcial Properties | |||||
CMC | Thickness (mm) |
Mass(unset) (kg/m2) |
Density(unset) (kg/m3) |
Density(set) (Kg/m3) |
Roll Width (m) |
CMC5 | 5 | 8 | 1500 | 20% | 2.1 |
CMC8 | 8 | 11 | 1500 | 20% | 2.1 |
CMC13 | 13 | 18 | 1500 | 20% | 2.1 |
. | |||||
Pre-set CC Properties | |||||
Setting | |||||
Working time: 1-2 hours subject to ambient temperature. | |||||
CC will achieve 70-80% strength at 24 hours after hydration. | |||||
Method of hydration | |||||
Spray the fiber surface with water until it it feels wet to touch for several minutes | |||||
after spraying. | |||||
Re-spray the CC again after 1 hour if: | |||||
1.installing CC in a steep or vertical surface; | |||||
2.Installing in warm climates; | |||||
Notes: | |||||
1. CMC can not be over hydrated and an excess of water is always recommended; | |||||
2. Minimum ratio of water:CMC by weight: 1:4 | |||||
3. Don't jet high pressure water directly onto the CMC as this may wash a channel in CMC. | |||||
4. Please use non-saline water for hydration.If CMC will be used for sea projects,please | |||||
advise us beforehand. | |||||
5. CMC can hydrate and set under water; | |||||
6. CMC has a working time of 1-6hours after hydration. Don't move or touch CMC | |||||
once it has begun to set. | |||||
7. Working time will be reduced in hot climate; | |||||
8. CMC will set hard in 2-3 hours,but will continue to gain strength for several months. | |||||
Set CC Properties | |||||
Strength: PioneerTex Concrete Mat Cloth has very high early strength | |||||
Item | Test Method | MARV | |||
Compressive Strength | ASTMC109-02 | 35-40 Mpa | |||
Bending Strength | BS EN12467:2004 | 3-6 Mpa | |||
CBR Puncture Strength | EN ISO12236:2007 | 3.5KN | |||
Tensile Strength(KN/M) | |||||
Length Direction | Width Diection | ||||
CMC5 | 25 | 20 | |||
CMC8 | 28 | 24 | |||
CMC13 | 32 | 28 | |||
Other | |||||
Item | Test Method | Value | |||
Freeze-thaw resistance | BS EN12467:2004 Part5.5.2 | pass | |||
Soak Dry | BS EN12467:2004 Part5.5.5 | pass | |||
Water Impermeability | BS EN12467:2004 Part5.4.4 | pass | |||
Fire Retardant | 16 CFR PART 1633 | pass |
Who are we?
PioneerTEX is the professional and leading manufacturer of concrete mat cloth rolls in China.
We have the patent for Concrete Mat Cloth in China.
We developed Concrete Mat Cloth Since 2014, and we get the patent in 2017.
And the technolog for Concrete Mat Cloth is mature in 2016.
What is Concrete Mat Cloth (CMC) GCCM ?
CMC GCCM is a flexible and soft cement impregnated fabric, that hardens on hydration to form a thin,durable,water proof and fire retardant concrete layer. Essentially, it's concrete on a roll.
What's the structure of Concrete Mat Cloth GCCM?
CMC GCCM was made of woven geotextile, nonwoven geotextile, HDPE geomembrane, and 3D structure geocomposite fabric.
The specially formulated dry concrete powder mix will be reinforced by 3D mesh geo-fabric, and sandwiched between porous nonwoven geotextile and water proof HDPE geomembrane or Aluminium Foil composite.
How does the Concrete Mat Cloth CMC GCCM work?
CMC GCCM allows concrete construction without the need for plant or mixing equipment. It's very easy, and just add water on the CMC non-waterproof side.
Once Set, the 3D mesh fabric will reinforce the concrete, prevent crack propagation and provide a safe plastic failure mode. The woven and nonwoven geotextile on the top side will offer special protection on the CMC, and offer higher tensile strength for composite.
HDPE geomembrane backing on the bottom surface of CMC ensures the material is completely water proof.
How many types of Concrete Mat Cloth GCCM are we manufacturing?
CMC GCCM is available in 3 thickness:
CMC5,
CMC8
CMC13.
They are 5,8 and 13mm thick respectively.
The CMC will become hard after hydration as below:
The Concrete Mat Cloth rolls before hydration is as below:
Application:
Ditch line
Slope Protection
Tunnel lining
Pond liner
Water reservior